The equipment quote lands in your inbox. The faster oven fits. You can afford the purchase. There’s one more question before it goes into the drawing: what would have to happen on an ordinary trading day for you to earn that money back?
Start with the difference between the two plans. In our 5D cost plan, the oven has an ID that follows it from the drawing into the budget. Against that ID we can see the price difference, delivery, a possible change to the electrical connection and the labor to install it. We can put a drink-station move beside it on the same terms. A short move on paper can become a new counter and a plumbing visit in the estimate. [1]
Here’s the calculation I’d put beside the drawing. Take the extra installed cost of the faster oven and divide it by what you keep from one additional lunch after ingredients, packaging and other per-order costs. If paid hours and running costs stay the same, that gives you the extra lunches you need to sell to recover the investment. Divide again by the number of days you plan to trade before you want your money back. Now you have a daily number the operator can challenge. Are that many people walking away because the oven is full? Or is the sandwich already waiting on the tea? [2]
Try it again with the lunch traffic you expect on a quiet weekday. If the crew needs paid help to complete those orders, put the wages into the calculation. Give keeping the oven and adding a pair of hands during the rush a fair hearing, too. And if moving the drinks gives the cashier time to greet a regular, say what that time is worth to the restaurant you want to run. You can choose to invest in hospitality without booking a payroll saving.
That’s the decision I want an owner to have in hand before construction: what the change costs, what must happen for it to earn its keep, and whether you still want it on a slow Tuesday.
Have a decision like this on your opening plan? Email projects@kelliepatry.com with the two options you’re weighing and tell us what a busy shift looks like for your crew.
Sources & editorial note
Sources and method
[1] Royal Institution of Chartered Surveyors, International BIM Implementation Guide, figure 57, p. 42. The figure traces model quantities into a cost plan.
[2] U.S. Small Business Administration, Break-even point calculator. KPHD adapts its unit contribution formula to estimate the additional lunches needed to recover an equipment upgrade.
The ideas are mine — lived, read, and noticed first. AI writing assistance helps me get them onto the page. — Kellie Patry