One team answers for how your place feels and how it runs, from before the lease to after opening. The work moves in stages, and each one ends the same way: you make a decision, and you keep the drawings or documents behind it. Below is what happens at each stage, what you get, and what we need from you.

THE ARGUMENT

five things we hold to on every project.

A restaurant project is often split across a dozen consultants, and the operator ends up coordinating all of them. We design the room around the business that has to run in it.

01

know before you sign.

The site decides more than the design does, so we check the fit before the lease is signed.

02

front and back of house are one project.

A guest feels the kitchen as the wait for a plate, so we draw the two together.

03

one team answers for the whole.

Fewer handoffs, and no one on your side left coordinating a dozen consultants.

04

you bring the feeling. we bring the plan.

The design starts with the places you love and the ideas you haven’t finished.

05

every decision earns its place.

Discipline in the layout, the equipment and the budget pays for the moments guests talk about.

00

START HERE

before the lease

check the site before you sign.

Before you sign a lease or commit to a build-out, we test whether the space can do what your business needs. We look at the layout, the equipment, the code questions, the budget and how long it will take.

We do this remotely, for a site anywhere. It is a first read, not a code determination, so we also tell you what still needs to be confirmed and who should confirm it.

WHAT YOU GET

— Feasibility report with findings and recommendations

— Preliminary space plan or test fit

— Review of the equipment layout the concept needs

— Order-of-magnitude construction budget

— Summary of what the permits will require

WHAT WE NEED FROM YOU

The address, the concept in one sentence, and a floor plan if you have one.

SEE ONE FIRST

request a sample feasibility report.

A worked example on a made-up site, laid out the way yours would be: findings, a test fit, the equipment review, the budget range and the permit summary. We email it to you.

01

STAGE 01

discovery

we learn the business first.

We start with the operator, the guest, the site and the budget. Before we draw anything, we watch a service, sit with your team to work through their questions, and walk in the door at the hour your guests do.

Then we put the scope, the phases and the decision points in writing, so you know what you are getting before work starts.

WHAT YOU GET

— A written brief

— A proposal with scope, phases and deliverables

— A contract that sets the decision points

WHAT WE NEED FROM YOU

The site, a budget range, your timing, and access to your team and to a service.

02

STAGE 02

design

front and back of house, designed together.

Design starts with Brandstorm, which turns your point of view, the guest experience and your operating needs into one direction. Schematic design is the first full idea: layout, guest flow, back of house and concept, all tested against the budget.

We design the kitchen and the bar alongside the dining room, not after it: the equipment layout, the workflow, the stations and the route a plate takes to the table. When code or complexity calls for a foodservice consultant or engineer, we bring them in and coordinate their work.

Design development makes the idea specific: materials, finishes, lighting intent, millwork, equipment specifications, and the furniture, fixtures and equipment (FF&E).

During schematic design, rendering studies test the layout, sightlines and service before anything is built. Full renderings follow at the end of design development, once the materials and details are set.

86 sec

saved on each round of five drinks at The Normandie Club, timed on mock-ups of two bar layouts before the bar was built.

WHAT YOU GET

— Design direction from Brandstorm

— Schematic floor plans and elevations

— Kitchen and bar design: equipment layout and list

— Rendering studies during schematic design; full renderings at the end of design development

— Design guide: palette, finish schedule and samples

— Equipment specifications and cut sheets

— FF&E schedule with budget allocations

— Construction budget estimate

WHAT WE NEED FROM YOU

Clear decisions at the end of each phase.

03

STAGE 03

documents + permits

drawings the contractor builds from and the city reviews.

We produce the construction documents, coordinate the engineers, and prepare the building and health department submittals. Then we take the set through plan check and answer corrections until it clears.

Licensed professionals stamp and seal where the law requires it, and the agency issues the permit.

WHAT YOU GET

— Permit-ready documentation set

— Specifications and finish schedules

— Building and health department submittals

— Plan check responses through clearance

WHAT WE NEED FROM YOU

Quick answers when the city asks a question.

04

STAGE 04

build

what gets built matches the design.

We compare contractor bids line by line, so you choose on scope, not just on price. During construction we visit the site, answer the contractor’s questions, and review submittals and shop drawings.

If you want, we can also order your FF&E and coordinate its delivery, or manage the project on the owner’s side.

WHAT YOU GET

— Bid comparison

— Site visit reports

— RFI log with responses

— Submittal and shop drawing reviews

— Optional: FF&E procurement

— Optional: owner-side project management

WHAT WE NEED FROM YOU

One person who can make the call on site.

05

STAGE 05

opening

you open in the room that was designed.

Before opening, we walk the space, write the punch list, coordinate the final inspections and close out the project, so your team starts service in the room we drew.

WHAT YOU GET

— Punch list

— Final inspection coordination

— As-built documentation

WHAT WE NEED FROM YOU

Time on site for the final walk-through.

WAYS TO WORK WITH US

five ways in. one team throughout.

feasibility read

A first read on the site, the equipment, the code questions and the budget, before you commit.

REMOTE, ANYWHERE

design intent

We carry the design from Brandstorm through design development. A local Architect of Record stamps the drawings, obtains the permit and administers construction.

ANYWHERE IN THE US

full design through permits

Design, construction documents, and the set taken through plan check.

LOS ANGELES + CALIFORNIA

full design through opening

Everything above, plus construction administration and closeout.

LOS ANGELES + CALIFORNIA

standards for multi-site groups

A prototype, a design standards manual and roll-out kits for each format.

ANYWHERE

FF&E procurement and project management can be added to any of these. We agree scope, deliverables, fees and schedule after a first conversation about your business, the site and the brief.

NOT OUR SCOPE

branding, graphic design and signage.

We work with your brand designer so the room and the identity line up.

YOUR PART

what makes a project go well.

— One person who can make the call

— Decisions when they are due, at the end of each phase

— Access to your team, and to a service, early on

— A written budget at the start, so the design is tested against it

what do I get from a hospitality designer?

At KPHD, each stage ends with documents you keep: a brief and proposal, schematic plans and rendering studies, a design guide, FF&E schedule and full renderings, a permit-ready set, and construction records through opening.

do you provide renderings?

Yes. KPHD does rendering studies during schematic design, so the operator can decide on layout, sightlines and service before construction, and delivers full renderings at the end of design development.

do you design commercial kitchens?

Yes. KPHD designs the kitchen and bar with the guest space: equipment layout, workflow, equipment lists, specifications and cut sheets. Foodservice consultants and engineers come in where code or complexity calls for them.

can you help before I sign a lease?

Yes. A feasibility read checks the space, the equipment, the code questions and the budget before you commit.

do you work outside Los Angeles?

Yes. Feasibility reads and standards work are remote. Elsewhere in the US, KPHD delivers the design and a local Architect of Record stamps, permits and administers construction.

how are fees set?

After a first conversation, based on the scope, the site and the level of involvement you need.

tell us what you are opening.

tell us what you are opening.

Tell us what you are opening or changing, where it is, and what you know so far about timing and budget. Plans help if you have them.